Home

ISO 9001-2008
Certified Company

Project References : Jobs Completed / Under Execution

Fire Coating :

  • PWDC Logistic Warehouse at Nizwa.
  • PWDC Logistic Warehouse at Sohar.
  • Utility Building of Majan Glass Factory at Sohar.
  • Omani Marble Factory at Rusayl.
  • Shamal Plastic Industries at Sohar.
  • Toyota 3S Facilities at Seeb Sanaya.
  • Toyota Showroom & Warehouse Facilities at Liwa.
  • Toyota Warehouse at Al Amarat . (25,000sqm)
  • SBG Warehouse Facilities at Al Rawdhah (25,000sqm).
  • L&T Facilities at Sohar (1250MT)
  • Extension of Toyota Parts Centre at Al AmArat (5000sqm)
  • Toyota Service facilities at Liwa (5,000sqm)
  • Mega Body Shop at Ghala ( 40.000 Sq.m)
  • Hino 3S Facilities at Azaiba (10,000 Sq.m)
  • Aircraft Hanger at Mussanna Air Base.
  • Royal Philharmonic Orchestra building at Bait Al Barka.
  • Toyota workshop at Karsha—2500 M2
  • Warehouse for Towell properties at Rumais—8000 M2
  • Extension of Check In Hall at Muscat International Airport - 2000M2
  • LULU Hyper Market at Nizwa—10000 M2
  • Al Anwar Ceramics at Nizwa—8000 M2
  • Touristic Complex at Salalah—16000 M2
  • Factory Building for Raha Polyproduct—1500M2
  • Atyab Bakery at Barka—8500 M2
  • Toyota Showroom & Accommodation Building at Jalan Bani Bu Ali.

Specialised Coatings :

  • Thermal Coating for K.M.Trading Warehouse at Al Amerat.
  • Substation Coating for TVS Foundry at Salalah.
  • Cementitious Coating for Douglass OHI at Barka Power Plant.
  • Cementitious Coating for Oman Flour Mills at Muscat Port.
  • Coal Tar Epoxy Coating for Gulfar at Al Ansab.STP
  • Substructure Bituminous Coating for L&T at PalmGardens Sohar.
  • Substructure Bituminous Coating for L&T at Bar Al Jissah Resort.
  • Substructure Bituminous Coating for L&T at Mega Body Shop Ghala.
  • Coating of 7 Coats Epoxy for Barka Power Project Reservoir.
  • Muscat City Center Floor Coating Works.
  • Anti-Carbonation and Other various protective coating for Royal Opera House at Qurum.
  • Anti-Carbonation and Other various protective coating for Majlis Oman, Al Bustan.
  • Anti-Carbonation Protective Coating for LULU Car Park at Bousher.

Floor Coatings :

  • Floor Coating works for Toyota Service Facilities at Wattayah.
  • Floor Coating works for Emirates Engineering Center, Dubai.
  • Car Park at Dubai Cargo Services.
  • Floor Coating works for SBG MAN 3S facilities at Ghala.
  • Traffic deck coating for the ramps for LULU Car Park.
  • Floor Coating at Rusail Factory for Sam Trading
  • Epoxy floor coating for Toyota Showroom at Liwa.
  • Self leveling epoxy overlay system for Gulfar at Al Ansab STP.
  • Traffic deck coating for central prison at Sumail.
  • 7 Coats Epoxy application for Barka Power Project.
  • Car Park Anti Carbonation coating works for Emirates Engineering Center, Dubai.
  • Epoxy floor coating - Resi. & Commercial building at Al Barsha, Dubai
  • Epoxy floor coating—Resi. building at Tecom, Dubai.
  • Epoxy floor coating—Resi. & Commercial building at Karama, Dubai.
  • Muscat City Center Epoxy and polyurethane Floor Coating Works.
  • Epoxy Floor Coating works for SBG MAN 3S facilities at Ghala.
  • Epoxy Floor Coating works for Toyota Service Facilities at Buraimi
  • Epoxy Floor Coating works for Toyota Service Facilities at Salaalh
  • Epoxy Floor Coating works for Toyota Service Facilities at Liwa
  • Epoxy floor coating for Al Ansab STP.
  • Epoxy floor coating for Al Fardhan complex at Azaiba.
  • Epoxy floor coating for OTE warehouse at Ghala.
  • Epoxy floor coating for MOH warehouse at Ghubra.
  • Epoxy floor coating for OHI Marine warehouse at Mabela
  • Epoxy Coating for Mixed Use Development at Al Khuwair for L&T
  • Epoxy Coating for Commercial Building at Wattaya.
  • Epoxy Coating for Independent Power Plant at Sohar for Douglas OHI
  • Epoxy Coating for Toyota Service Facility at Bidiya.
  • Epoxy Floor Coating at Dolphin Complx, Bousher.
  • Epoxy Floor Coating for Office Building at Qurum.
  • Epoxy Floor Coating at 24 Duplex Apartment, Madinat Qaboos for Towell Construction.
  • Polyurethane floor coating for Aga Khan Center , Dubai.
  • Polyurethane floor coating Body & Paint center for SBG at Ghala
  • Polyurethane floor coating for Switz bakery at Sohar.
  • Polyurethane coating works Lexus,Kia showroom at Wattayyah.
  • Polyurethane floor coating for Vehicle Facility workshop at Mawela.
  • Polyurethane Floor Coating works for SBG Service Facilities at Wattayah
  • Epoxy and Polyurethane Coating for Commercial Building at Al Khuwair.
  • Polyurethane Coating at Al Fardan Complex, Ghala for Towell Construction.
  • Polyurethane Coating for Atyab Bakery at Barka.
  • Polyurethane Coating for Commercial Building at Ghala.
  • Polyurethane Coating for Saud bahwan Plaza at Ghubra.
  • Polyurethane Coating for Barr Al Jissah Resort Kitchen.
  • Polyurethane Coating for Food Factory (AATCO) at Sohar.
  • Polyurethane Coating for Carrefour Hyper Market at Sohar
  • Polyurethane Coating for Al Fair Hyper Market Qurum, Azaiba, Sohar.
  • Polyurethane Coating for Transport Complex at Seeb for Al Turki.

     

Civil :

  • Proposed Quality Control Office at Oman Flour Mills.
  • Proposed Maintenance Building at Oman Flour Mills.
  • Proposed Commercial and Residential Complex at Nizwa for Al-Omaniya Financial Services S.A.O.G.
  • Construction of 10 Classroom School Building at Al Aflaj, Mudhaibi, for Ministry Of Education.
  • Construction of Residential and Commercial Building for Mr. Sultan Mohammed Khatrosh Al Namani at Bausher.
  • Construction of Wali's Office at Suwaiq for Ministry of Interior.
  • Construction of Extension of Classrooms and proposed Multi purpose Hall at Indian School, Seeb.
  • Construction of Administration Building for PAEW at Quriyat.
  • Civil works for Installation of Portacabins & Generator set at Sheetal Range (SSF Camp)
  • Construction of Pedestal and Installation of GRP Panel water tank at Azaiba (SSF Camp)
  • Major Maintenance work(Gonu) at Samoud Garrisson & Azaiba (SSF Camp)

     

  • Renovation works for the intake tunnel for Oman Flour Mills at Muscat Port.
  • Mockup for Aircraft SSI Halban.
  • Equipment Room for SSF Halban.
  • Renovation of Oman Flour Mill Silos and Underground Tunnel at Muscat Port.
  • Excavation, Leveling, Civil Foundation Works and installation of Camp Accommodation Cabins including fixing of 135KVA Diesel Generator and associated Electrical cabling at SSF, Sheetal, near Duqum.

     

Water Proofing:

  • Dolphin Complex at Bausher.
  • Toyota Showroom for SBG at Buraimi.
  • HE Ali Moosa Villa Roof Water Proofing at Qurum.
  • Shini Shatti Commercial & Residential Buildings for Al Kandeel Real Estate.
  • Dharamsy Nensy Villa at Qurum.
  • Toyota Showroom for SBG at Wattayah.
  • Re-Waterproofing of Nizwa Mosque.
  • PVC membrane waterproofing for Saud Bahwan Plaza at Al-Ghubra.
  • BahwanVechicle Workshop Roof Water Proofing at Rusayl.
  • Combo Roof and Wet Area Water Proofing at Palm Gardens Sohar.
  • Combo Roofing System for Consultants'Office at Bar Al Jissah Resort.
  • Water Proofing at Bar Al Jissah Residential Complex for L&T.
  • Water Proofing Works for TVS Foundry at Salalah.
  • Roof Waterproofing with EPDM Membrane and accessories at Al - Fardan Complex, Ghubra for Towel Construction & Maintenance Co.LLC
  • Podium Waterproofing with EPDM Membrane and accessories at 24 Villas, Madinat Qaboos for Towel Construction & Maintenance Co.LLC.
  • Various Waterproofing works for L&T at Al Ameen Mosque.
  • Various Waterproofing works for L&T at MC—Salalah International Airport.
  • Various Waterproofing works for L&T at Mixed Use Development, Al Khuwair.
  • Various Waterproofing works for L&T at Maktabi Wattaya.
  • Various Waterproofing works for L&T at German University.
  • Various Waterproofing works for L&T at OCTAL, Salalah.
  • Various Waterproofing works for Douglas OHI at Sohar IPP project.
  • Various Waterproofing works for Douglas OHI at Oman Residence Project.
  • Various Waterproofing works for Douglas OHI at Silver House, Ghala.
  • Various Waterproofing works for Douglas OHI at Barka Power Plant II.
  • Various Waterproofing works for Douglas OHI at Office building Qurum.
  • Various Waterproofing works for Douglas OHI at Oman Dental College.
  • Various Waterproofing works for Douglas OHI at Sohar IPP project.
  • Wet Area Waterproofing works for Towel Construction at Apartment Block — 1, Madinat Qaboos.
  • Wet Area Waterproofing works for Towel Construction at 88 Villas at Al Khoud.

     

  • Various Waterproofing works for Al Mest Contracting at Barracks for RCA at Seeb.
  • Various Waterproofing works for BAM International at Oman Botanical Garden.
  • Various Waterproofing works for OCSO at Al Awabi Staff Accommodation.
  • Various Waterproofing works for Towel Construction at Saud Bahwan Plaza, Ghubra.
  • Various Waterproofing works for Simplex Infrastructure at Saud Bahwan Plaza, Ghubra.

     

Fabrication & Installation :

  • Cement Silo Capacity 60 Tons Fabrication & Installation at Sohar Al Multaqa for Allied Business Corporation.
  • GRP Water Tank Capacity 30,000 gallons installation with Foundation and Footings for Sultans'Special Force at Azaiba.
  • Water Tanks Capacity 650 gallons Fabrication on 3 Tons Eicher Chassis for KIA Motors.
  • Roof Panel replacement at Wadi Kabir Tyre Testing Equipment Division for MHD
  • Water Tanks Capacity 5000 gallons Fabrication on 40Ton Hino Chassis for Saud Bahwan
  • Cargo Body Fabrication on Tata Novus 10 Ton Truck for National Wood Nizwa.
Flooring:
  • Vinyl Flooring Works at Rusayl Cement Factory.
  • Vinyl Flooring Works at L&T at Bar Al Jissah Resort.

     

Other Allied Works:

  • Re-Injectable hose work for house of Musical Arts at Shatti Al Qurum.
  • Pressure Injection works for TVS Foundry Water Tank at Salalah.
  • Re-Injectable hose work for Saud Bahwan Plaza Project at Al-Ghubra.
  • PVC Membrane work - Materpren BG, to Saud Bahwan Plaza Project, Al Ghubrah — 55,000 M2
  • Fire Stop work for MEP Penetration works at Silver House, Ghala for Douglas OHI.
  • Fire Stop work for MEP Penetration works at Oman Residence, Al Khuwair for Douglas OHI.
  • Fire Stop work for MEP Penetration works at Musannah Air Base for Douglas OHI.

     

Pressure Injection work:

  • Pressure Injection work at Barka Power Plant for Douglas OHI.
  • Pressure Injection work for water tanks at Al Fardan Complex for Towel Construction & Maintenance Co. LLC.
  • Pressure Injection work for Raft Connection Joint for Ministry of Finance at Muscat.
  • Pressure Injection work STP Al Ansab at Galfar.
  • Pressure Injection work MEDC at Ghubra.

German Certificate Holders:

  • Our Team led by General Manager & Engineer specially trained in Germany for coating and other specialized works.

Ceresit EIFS System:

  • Towel Warehouse at Barka — R.O. 66,250/-
  • Omantel Building at Blue City — R.O. 21,250/-
  • Abu Maather Front Office — R.O. 3,750/-
  • Commercial Building at Madinat Qaboos — R.O. 6,250/-

Test Data

Fire Coating Image
 
FIRE COATING
Coating which protects steel structure in fire situations by the expansion.
 
Read More
Water Proofing
 
WATER PROOFING
Waterproofing protects the structure from water / moisture ingress by complete adhesion.
 
Read More
Construction
 
CONSTRUCTION
Executing all types of construction projects from its separate construction division..
 
Read More
Windows And Doors
 
WINDOWS & DOORS
Typi non habent claritatem insitam; est usus legentis.
 
Read More